Asphalt maintenance
Asphalt Paving in Arkansas
Arkansas Pavement lays new asphalt for commercial properties across Arkansas: parking lots, access drives, loading areas and private roads. New mat goes down either as an overlay, where the base underneath is still sound, or as a full rebuild where it is not. Which one your lot needs is decided on the property, and the estimate is free.
Asphalt is the most common commercial paving material because it goes down fast, carries heavy traffic and can be maintained in place for decades rather than replaced.
What the work covers
- New lots, access drives and loading areas
- Overlay where the base is still sound
- Grading and base work before the mat goes down
- Commercial properties, HOAs and managed sites
Licensed, insured, bonded. Monday to Friday, 8:00 AM to 5:00 PM. Saturday by appointment.
How it works
Three steps, and the first one costs nothing.
-
Step 1
You get in touch
Call, or send the property details and what you have noticed about the surface. Either one reaches the crew directly.
-
Step 2
Someone walks the lot
Commercial asphalt is priced off the surface itself, so the quote follows a site visit rather than a phone call. The estimate is free.
-
Step 3
You get the order of work
What needs doing now, what can wait, and how the sections would be phased so the property keeps trading while the crew is there.
Asphalt Paving: common questions
What is the difference between an overlay and full depth paving, and how do you tell which one your lot needs?
An overlay is a new lift of asphalt bonded on top of the old surface. It replaces the wearing course and nothing below it. Full depth means the old pavement comes out, the base gets rebuilt and compacted, and the lot goes back new. What decides it is what is failing. Raveling, oxidation and shallow surface cracking are wearing course problems and an overlay answers them. Alligator cracking, rutting that moves under load, and areas that stay soft after rain are base failure, and asphalt laid over that reflects the same pattern back through. Core cuts tell you the existing thickness; the surface will not.
Why do the base and the drainage decide how long a new lot lasts?
Asphalt is a flexible pavement. It does not span a load the way a concrete slab does; it spreads the load down into the base and the subgrade. The base carries your lot and the mat on top distributes. Water is what takes the base away. A base holding water gives up bearing strength, the pavement flexes further under every truck, and repeated flexing is what produces alligator cracking. Standing water also drives moisture into the mat and strips binder off the aggregate. Grade, and where water leaves the lot, decide how many years you get more than the thickness of the asphalt does.
What does compaction actually do, and why does it come up so often with paving?
Asphalt gets its strength from density. The mix goes down hot and the rollers squeeze the air out of it. Air voids left in the mat are open routes for water and oxygen, which is why an under-rolled lot ravels and grays early even where the base is sound. Compaction only happens inside a temperature window: once the mat cools below roughly 175 to 185 degrees, the rollers stop gaining density. Cold days, thin lifts and long hauls all shorten that window because the mat cools faster. The longitudinal joint between passes is the lowest density part of any lot, and it usually opens first.
When can traffic go back on new asphalt, and how long before it can be sealcoated?
Asphalt does not cure the way concrete does. It stiffens as it cools, so the wait before traffic is a cooling question, and a thick mat on a warm night holds heat longer than a thin one in the fall. A new lot also stays soft for its first weeks in service: power steering turned against a stopped wheel, trailer jacks and dumpster casters all leave marks in it. The first seal is a much longer wait. Fresh binder is still giving off volatile oils and sealer will not bond to a surface doing that, so the first coat waits for the mat to weather through a season.
What drives the price of a paving job?
Square footage is the starting point, not the answer. Thickness follows the load: a lot that takes loaded delivery and trash trucks needs a deeper section than one that only sees cars, and every added inch is more tonnage. Then there is what has to happen first, removal and haul off of the old pavement, stone brought in to rebuild a soft base, grade or drainage correction. Layout moves it too. Tight islands, curb lines and phasing to keep half your lot open all force handwork and repeat mobilizations instead of a paver running long passes. Asphalt binder is refined from crude, so material pricing moves with oil.
The rest of the cycle
Most lots need more than one of these, and the order they happen in matters. One crew covers all of it, so a single visit can handle more than one thing.
- Asphalt Crack Filling Sealing cracks before water reaches the base and turns them into potholes.
- Asphalt Sealcoating A protective coat that slows weather damage and restores a clean black finish.
- Asphalt Repair Patching and full-depth repair for potholes, failures and worn areas.
- Parking Lot Striping Layout, restriping and ADA markings that keep a lot legible and compliant.
Customer experiences
What customers say about the crew
5.0 from 19 Google reviews
Reviews from our Google Business Profile, listed under Brice Contracting, and under Straight and Narrow Striping before that. Same company, same crews, same phone number.
Brice Contracting did a great job sealcoating our driveway. Prompt, efficient, good communication, good price, thank you gentlemen!
Austin and his team communicated clearly on how repairs and seal coating would be done. This was a large project. They stayed within budget and had exceptional follow up.
Brice did an excellent job redoing our church parking lot, it looks so nice and clean. I highly recommend Brice Contracting for your job!
We needed some speed bumps installed in our parking lot. Brice made sure all of our needs were met, and went the extra mile to make us satisfied. His crew was timely, clean, and polite. On top of that, the work was done at a great price. Highly recommend.
Quality Work and Excellent Service! Austin was very communicative while developing the plan and executing the work.
Austin and Ethan showed up earlier than expected and took so much pride in their work. It looks amazing.
Scroll for more reviews
Next step
Get asphalt paving quoted
Send the property details and someone will set up a time to walk it. Commercial asphalt is priced off the surface itself, so a number before anyone has seen the lot would be a guess rather than a quote. The estimate is free.
Prefer to talk? Call (501) 208-3393.
Ready to get your lot looked at?
Call or text, or send the property details and someone will set a time to walk it. You get a response the same day. Commercial asphalt is priced off the surface itself, so the estimate happens on your ground and it is free.